Elysia Tools Docs
EN
Language
ZHESPTRUFRDEEN
Back to site
Browse tools

Math & Numbers

Critical Path Method Calculator (CPM)

Activity-on-node CPM: ES/EF/LS/LF, total float, project duration, and every critical path; cycles and unknown predecessors are rejected.

text· Text resultOpen tool

Quick start

Call this tool from your code in three languages.

cURL
curl -X POST 'https://api.elysiatools.com/en/api/tools/critical-path-method' \
  -H 'Content-Type: application/json' \
  -d '{"activities":"A, 4, -\nB, 3, A\nC, 2, A\nD, 5, B\nE, 4, C\nF, 2, D E","decimalPlaces":2}'

API reference

Send a POST request with your inputs as JSON. File parameters require a separate upload first.

Endpoint

HTTP
POST https://api.elysiatools.com/en/api/tools/critical-path-method

Parameters

NameTypeRequiredDescription
activitiestextareaYesOne activity per line: unique name (1–8 letters/digits), non-negative duration, then predecessor names separated by spaces ('-' if none).
decimalPlacesnumberNo—

Response format

Text result

JSON
{
  "result": "Processed text content",
  "error": "Error message (optional)",
  "message": "Notification message (optional)",
  "metadata": {
    "key": "value"
  }
}

MCP integration

Add this tool to your Model Context Protocol server so AI agents can list and call it.

Server configuration

Add this block to your MCP client configuration:

mcp.json
{
  "mcpServers": {
    "elysiatools-critical-path-method": {
      "name": "critical-path-method",
      "description": "Activity-on-node CPM: ES/EF/LS/LF, total float, project duration, and every critical path; cycles and unknown predecessors are rejected.",
      "baseUrl": "https://api.elysiatools.com/mcp/sse?toolId=critical-path-method",
      "command": "",
      "args": [],
      "env": {},
      "isActive": true,
      "type": "sse"
    }
  }
}

List available tools

After connecting to the SSE endpoint, list the exposed tools:

tools/list
{
  "jsonrpc": "2.0",
  "id": 1,
  "method": "tools/list"
}

Call this tool

Invoke the tool by its id, passing arguments built from its parameters:

tools/call
{
  "jsonrpc": "2.0",
  "id": 2,
  "method": "tools/call",
  "params": {
    "name": "critical-path-method",
    "arguments": {
  "activities": "A, 4, -\nB, 3, A\nC, 2, A\nD, 5, B\nE, 4, C\nF, 2, D E",
  "decimalPlaces": 2
}
  }
}
Chain multiple tools in one session with a comma-separated toolId list, e.g. /mcp/sse?toolId=png-to-webp,jpg-to-webp,gif-to-webp (max 20).

Questions or issues? Contact [email protected]

Browse toolsOpen tool

© 2026 Elysia Tools. Developer documentation.

Back to siteBrowse tools